On 04/01/2006 Sunny found the stripped ntuples for MH = 190 and 200 GeV had been swapped for blessing, which explains why the jigsaw in signal acceptance, signal event yield, expected limits and observed limits. Sunny asked Mark and Mircea not to be mad with her; Mark and Mircea agreed without second thought.
The corrected results are here: